Oregon Ironworks: Folsom Dam Auxiliary Spillway Control Structure
Blast and apply a thermal spray coating, and a high performance 3 coat epoxy urethane system to the roller housing mounts. 180,000 lbs. of material. QP-3 required. Daily TSC equipment tests, bend tests, soluble salt tests, air quality tests, and strict pull test requirements.
Vigor: New Jersey Route 7 Hackensack River Wittpen Bridge Main Lift Span
Blast and application of Zinc Clad DOT to structural steel beams. QP-3. Daily inspection logs, SSPC PA 1, third party inspection.
JH Kelly, LLC.: PG&E Burney California
Blast and application of two coat high performance coating system. QP-3. Integration of multiple third-party inspectors. Daily coating logs. SSPC PA1.
Oregon Ironworks: Westinghouse CH59
Blast and application of one coat high performance coating system. Nuclear Grade inspection. Integration of multiple third-party inspectors. 25-page report required for every piece. Perfect traceability of parts an absolute requirement.