×
Register an Account
Forgot Login?

Oregon Ironworks: Folsom Dam Auxiliary Spillway Control Structure
Blast and apply a thermal spray coating, and a high performance 3 coat epoxy urethane system to the roller housing mounts. 180,000 lbs. of material. QP-3 required. Daily TSC equipment tests, bend tests, soluble salt tests, air quality tests, and strict pull test requirements.


Vigor: New Jersey Route 7 Hackensack River Wittpen Bridge Main Lift Span
Blast and application of Zinc Clad DOT to structural steel beams. QP-3. Daily inspection logs, SSPC PA 1, third party inspection.


JH Kelly, LLC.: PG&E Burney California
Blast and application of two coat high performance coating system. QP-3. Integration of multiple third-party inspectors. Daily coating logs. SSPC PA1.


Oregon Ironworks: Westinghouse CH59
Blast and application of one coat high performance coating system. Nuclear Grade inspection. Integration of multiple third-party inspectors. 25-page report required for every piece. Perfect traceability of parts an absolute requirement.






Page Last Updated: Sep 29, 2022 (13:43:51)
-
Oregon Sandblasting and Painting
10000 SW Herman Rd
Tualatin, Oregon 97062
  (503) 692-3575

Top of Page image
Powered By UnionActive - Copyright © 2024. All Rights Reserved.